Skip to Main Content

FAA499904323:   DBIA - High-Performance Contracting

FAA499904323 Active
DBIA - High-Performance Contracting
COURSE 2023-02-27
In traditional design-bid-build, contracts often contemplate only failure, with provisions and clauses that address what the aversive consequences will be once failure occurs. The most powerful design-build contracts, on the other hand, are written to include things such as award fee incentives to promote cooperation, teamwork and collaboration. Combined with the effective use of performance requirements, these aspirational contracts help the contracting parties to achieve extraordinary success.
AJW-C AJW-C
ILT 6.0
Prerequisites

 

D O T Triskelion

U.S. Department of Transportation

Federal Aviation Administration

800 Independence Avenue, SW

Washington, DC 20591

(866) TELL-FAA | (866) 835-5322