FAA47001065: (47001065) ERAM EAF500 SLE ESSC LAB TOUR PART 1 EBP (BRIEFING)
| FAA47001065 | Active | ||
| (47001065) ERAM EAF500 SLE ESSC LAB TOUR PART 1 EBP (BRIEFING) | |||
| COURSE | 2024-01-10 | ||
| Part 1 of 2 of the En Route System Support Complex (ESSC) Lab Tour briefing package for ERAM release EAF500 covers the following updates: FTI Redundancy Enhancement; Removal of Alternate Display Path; NAP Reald Added to WJHTC TB3; Mini2 and TTML Upgrade; Anticipated Time for Distribution Feedback Message; Updated Spin Boxes for Numeric Input; Linux Presentation Server Virtual Machine Rehosting; SkyData Sentry Monitoring of Linux Daemons and Services; Distribution of a Same-Name Release to an Individual Processor; Support M&C Switch Details Correction; Dynamic Alert Manager Daemon Monitoring; Management Port Status Removal; ES3 - Ops Workstation, Displays, Peripherals Replacement Overview; Revised Notification Login Warning Banner; Removal of EBUS/DARC External Interface from M&C; WJHTC and Gaithersburg Lbd STP-DC Conversion; Unique IP Addresses for SIMPL Processor in Test Labs; Actions Following Dual Failures on OPSLAN Workstations; Lab Gamma Configuration Rollback Tools; and M&C External Interface Window Update. | |||
| AJI-2300 | AJI-2300 | ||
| WBT | 1.0 | ||
| 1 | |||
| Prerequisites | |||